Whole Camps,
One Container at a Time.

For construction, mining, energy and infrastructure projects, modular units create organized workforce accommodation with sleeping rooms, shared facilities and support spaces — standardized for phased expansion and consistent specifications.

[ RECOMMENDED UNITS ]

A Unit Mix That
Fits the Scenario

ScenarioRecommended ModelWhy
Dormitory Mid-Fold units (14 / 40HQ) · 20ft ExpandableVolume bedding or comfort-grade rooms
Ablution Modular Bathroom PodDry/wet separated, easy-clean wet areas
Mess & Kitchen Modular Kitchen Pod + folding unitsCatering module plus dining space
Site Office 10ft / 20ft ExpandableOffice and meeting configurations
Storage Folding unit storage layoutLockable tools and supplies
[ PROGRAM ADVANTAGES ]

Engineering Support
for Tender Day

  • Phase-by-phase camp expansion with identical, interchangeable units
  • Lowest freight per bed: mid-fold ships 14 units per 40HQ
  • Wind resistance up to Grade 11 (280 km/h) on expandable models
  • Rock wool insulation and cold-climate packages for extreme sites
  • Camp layout drawings and engineering support for tender submissions
[ REQUEST A QUOTE ]

Request a Camp Layout & Engineering RFQ.

Share headcount, site conditions and target dates — our team will propose a camp layout, unit mix and phasing plan with engineering documentation.

Project RFQ
[ FURTHER READING ]

Keep Exploring.

Practical notes and updates from the factory — related to this system.